Online Auditing

Please find below our GDPR compliant on-line hotel audit form. Please complete to the best of your ability and ensure to attach key documents where asked to do so.

General Hotel Audit Form

HOTEL INFORMATION

MANAGEMENT & LEADERSHIP

DOCUMENTED SAFETY PROCEDURES & PROTOCOLS

TRAINING - LIFE & GENERAL SAFETY

List the training regimens in place by hotel departments:

Are engineering personnel appropriately trained in:

GUEST & OCCUPATIONAL SAFETY COMMITTEE

Describe:

EMERGENCY PLANNING & PREPAREDNESS

Does the Emergency/Disaster Response Plan include procedures for:

Is training given to:

PLANNED INSPECTIONS & TESTING

Are periodic and planned inspections conducted as relate to:

ENGINEERING SERVICES - SYSTEMS & PROCEDURES

Does the hotel engineering department have in place appropriate procedures that relate to:

Are contracted services provided for:

Are there specific instructions and controls relating to:

BOILER PLANT & WATER SYSTEMS

Are the following undertaken on a preventative maintenance schedule?:

HEATING VENTILATION & AIR CONDITIONING (HNAC)

Does the HVAC preventive maintenance schedule include the following: 

CHILLERS & REFRIGERATION SYSTEMS

Do the hotel maintain the following with regard to refrigerants:

POWER SUPPLY & DISTRIBUTION & ENERGY MANAGEMENT

Are electrical maintenance procedures in place to:

ELECTRICAL SAFETY

Switchboards

Are all switchboards: 

Fittings and outlets:

Extension cords & fittings:

Powered machines & portable tools:

Are the following in good condition and good working order:

Enter your free text here

Residual Current Devices (RCDs):

Is RCD protection provided for all electrical equipment that is:

WASTE & ENVIRONMENTAL MANAGEMENT - SYSTEMS & FACILITIES

Does the hotel effectively dispose of the following reusable materials: 

INCIDENT RESPONSE, MANAGEMENT, RECORDING & INVESTIGATIONS

INSURANCES

Enter your free text here

RISK MANAGEMENT IN PURCHASING & RECEIVING

SECURITY OPERATIONS & SYSTEMS

CLOSED CIRCUIT TV & ALARM SYSTEMS

HOUSEKEEPING & CLEANING OPERATIONS

LAUNDRY OPERATIONS & FACILITIES

LOADING DOCK/RECEIVING OPERATIONS

LIFTS, ESCALATORS & WALKWAYS

FOOD & BEVERAGE SERVICES & KITCHEN OPERATIONS

Confirm that:

Confirm that:

FIRE SAFETY SYSTEMS, PROCEDURES & EQUIPMENT

VALET & OTHER PARKING

If a “self-parking” facility is maintained – is there adequacy of signage relating to:

CHILDREN'S FACILITIES & CHILD-MINDING

Child play areas & equipment

LUGGAGE HANDLING & STORAGE FACILITIES

SWIMMING POOLS, BEACHFRONTS & SPAS

Do all of the pool gates:

Is there a waterfront recreational area? If yes:

Are power boats (including jet-skis), non-powered watercraft (e.g., sea kayaks, sailing boats, wind-surfers - or other water related equipment loaned, rented or leased to guests? If yes:

GARDENS, TERRACES & GROUNDS

GUEST ROOMS & FLOOR SAFETY

Enter your free text here

Hairdryers

Enter your free text here
Enter your free text here

Steam irons

Enter your free text here

Cots, high-chairs and strollers

DISCLAIMER STATEMENT

The Client recognises that this document is an independent external assessment against a specific standard or client checklist. It does not guarantee that no incident/non-conformity/violation has taken place before the audit and/or shall take place after the assessment by Alistair Cole Consulting within the facility. Alistair Cole Consulting conducts all assessments according to the relevant professional standards, based on ISO 9001/10011. However, it must be advised that each assessment methodology is based on a representative sampling approach of available information sources, such as data, information, records, certification, documents and files. It also includes interviews with a representative sample of knowledge/available staff and an inspection of representative sample of equipment, operations, activities, rooms and location at the assessed facility. Alistair Cole Consulting cannot reasonably be held accountable for the veracity, accuracy or completeness of available information prepared by other external parties or obtained via interviews of facility staff. Therefore, there may be issues which have not been discovered or identified during the audit. It is the responsibility of the audited entity to identify those issues though its own monitoring processes. This document only attests whether the assessed entity is meeting the Client’s checklist criteria. The Client remains the only judge to make the decision emanating from Alistair Cole Consulting’s review. The intervention of Alistair Cole Consulting does not release, substitute or discharge in any way the Client or assessed facility of their obligations as regards the analysis of the risks and compliance with relevant laws. Alistair Cole Consulting shall not be accountable for regulatory sanctions that may be assessed due to failure of the auditee to correct the audit findings documented in the audit report in a timely manner. Consequently, the Client recognises that Alistair Cole Consulting may in no way be held liable based on its performing of the audit in the event of legal action or sanctions taken for an infringement of laws or regulations, which would have occurred prior to, during or following the term of contract. The owner of this report remains with the party who had paid for it. Release permission must be provided by the Client prior to release to third parties. Unless otherwise agreed in a written agreement. This document is subject to Alistair Cole Consulting General Conditions for customised audit services, available at www.alistaircole.co.uk/t-cs. Any public use or marketing use of the Alistair Cole Consulting name, logo or brand is subject to prior written approval by Alistair Cole Consulting.